CONTRACT: |
Tank Roundabout, Flensburg Way, Leyland |
---|---|
CLIENT: |
Lancashire County Council (City Deal Project) |
SCOPE OF WORKS: |
Carriageway: Approx. 6000m2 full depth surfacing Subbase (150mm) AC32 HDM 2 x 80mm Layers AC20 HDM 2 x 70mm Layers HRA 35/14F Surf PSV65 @50mm 11,000m2 HRA 3514F Surf PSV65 @ 50m Nightworks under closure Footways: Approx. 2200m2 footway construction Ac20 Dense @ 60mm Ac6 Dense H/S @ 20mm |
MACHINES: |
|
KEY ACHEIVEMENTS: |
Installed using paver and Articulated Dump Truck. All texture depth specifications achieved, zero defects. |